Log In Register


Puckdropper has scored 289 goals and 351 assists in his lifetime.


Laying Track Outdoors - Posted to rec.models.railroad on May 16, 2007

It all started with an $8 purchase for a bunch of train stuff at a garage sale... Soon, I had a piece of track for my G-gauge locomotive as test track, and plans for a loop outside. To make a long story short, I'm skipping right to the laying track part.

Laying track for an outdoor railroad is a lot more prep work than that of an indoor layout. For an indoor layout, one merely has to attach track to a flat-ish surface and connect power. (Nitpick: Yes, quality track laying is much more difficult.) For an outdoor layout, "flat" is something that must be created. My simple loop of track required taking dirt out of the garden to level some of the worst spots, and tamping it all down.

Since things will grow in flat empty dirt, step two involves laying down a weed barrier and putting gravel on top of it. In my impatience to get trains running, I had laid track on top of the dirt and added the gravel later. I think this was a mistake. What I should have done was put the gravel down first, tamped it all down level, and then laid track. (G gauge track needs to be level side-to-side. Grades are fine, but you'll run into trouble with some equipment if it's not level side-to-side.)

If it's dry tomorrow (rained today) and I have the time, I'm looking at taking up the track, compacting the gravel underneath and leveling it side-to-side, and relaying it. It's a lot of work, but I think it's worth it.



Note: I posted this to rec.models.railroad on May 16, 2007.
Google Groups Archive



Update to 0.6!

Version 0.6
-----------

1. Status is shown by making "Log in" and "Log out" change accordingly.
2. Bug with magic quotes appears to be eliminated. Apparently some of the regression testing introduced a unstable combination of escaped text.
3. Fixed bug where new category names when posting would not be recognized. "new" would be displayed in its place.
4. Registration page now requires password to be confirmed before registration.
5. DB password is no longer hard coded in page code.
6. Administrator has access to new user admin functions.
7. New Feature! User Administration.
8. New Feature! Password Changing!
9. New Feature! Unregistration! (Indicates the user has unregistered in the comments.)
10. Admin post page now has the first category checked by default.
11. New Feature! Anonymous comments!
12. Settings are now kept in the database, rather than a settings file.
13. New Feature! Users can view past postings of comments.
14. Logged in users now no longer have a name field displayed. (If they changed the name field to something different previously, it would not show up in the "view comments I've posted" option.)
15. Blank usernames and passwords are not allowed. Registration and login pages should reflect this change.
16. Admins can change blog colors.

This post has been edited at 2007-05-21 05:15:29



Track rework


Track rework


The Garden Railway (TGR) has been taken up with the intent of reworking the ground underneath and properly ballasting the track. The rails are currently in storage, while unfavorable weather keeps track crews from working. Track supervisor Puckdropper hopes the rain will end soon so he can get the ground work finished.


Plow Finished


For immediate release--Puckdropper's Place announced that the snow plow they've been working on has been finished. If it snows this winter after the track rework has finished, The Garden Railway will be ready to clear the line.

Providing the power to clear the line will be a new Aristo-Craft RS3. If necessary, TGR will have the assistance of "the owner's touch" which is a big hand from the sky.



Patch to 0.5.1

Changelog:

1. Fixed magic quotes configuration error and bug.
2. Updated domain name code to reflect new domain name.



Milestone reached

Milestone Reached
by Green Bean (who's not a Pea)






Puckdropper's Place Car shops reached one of the final milestones in building their snow plow. This plow, along with a dedicated track crew, will allow Puckdropper's Place to run trains all through winter.

According to an internal memo, the milestone reached was putting the car frame and body on trucks for the first time. While the car isn't ready for service, the shop plans to have it ready by the first snow fall.

With temeratures in this area about 10 degrees below normal, the unseasonably cool trend has continued leaving many to wonder what the Winter will bring. I, for one, wish Puckdropper's Place the best with their snow plow project.


This post has been edited at 2006-09-10 21:27:32

This post has been edited at 2006-10-03 00:49:57

This post has been edited at 2006-11-13 01:21:34



Blog version 0.5 released!

Version 0.5
-----------

1. Fixed bug on delete category page where first category was not displayed.
2. HTML 4.01 Transitional Validation



Blog version 0.4 released!

Version 0.4
-----------

1. Fixed category error where categories would get truncated.
2. Duplicate user names are detected on the registration page and user is notified of that case.
3. Updated redirects so they use completely relative URLs.
4. Moved redirect code to a single file.
5. New Feature! Stand alone links are supported and the option is now presented on the index page.
6. Fixed category error where new posts had the category "new" rather than what was entered.
7. New Feature! Implemented category delete feature.
8. Fixed post page bug where selecting an existing category would put the post in a new NULL category.
9. Added code to prevent SQL query attacks
10. New Feature! Co-administrators
11. Admin status is checked for all admin pages.



Rail News 3-13-06

Puckdropper's Place Announces Acquisition of new rail line
by Pear E. White

In a much anticipated move by analysists, Puckdropper's Place announced their acquisition of the Long and Short Lines, a small railroad consisting of only two locomotives and a handful of freight cars. The LSL interchanges with the Northeast Indiana N-scale railroad, which has been a source of traffic for the industries served by the LSL.

In the deal, Puckdropper's Place acquired all the assets and liabilities of the LSL, and agreed to interchange agreements with the Northeast Indiana N-scale railroad. The former owners of the LSL recieved $250 million in return.

The former owner of the LSL, Paul Tree, stated, "It was time for me to move to other employment opportunities. I am happy Puckdropper's Place was willing to take over and maintain the railroad we worked so hard to build."

Tornado Rips Through Newly-Acquired LSL
by Pear E. White

The day after Puckdropper's Place acquired the Long and Short Lines, a tornado ripped up the road and much of the grass next to the track of the LSL. The tornado, which struck at 4:42 pm, was classified an F1 on the Fujita scale. Minor damage was done to the track, but the road leading to many line-side industries was completely destroyed.

Three I Times To Change Name
by Jonah Arch

The Three I Times, which is the paper publishing this article, announced their plans to dedicate their coverage to Puckdropper's Place, Inc's railroad operations, and change their name to Puckdropper's Place Post.

No plans have been made to change the details of the charter of the Three I times at this time.

This post has been edited at 2006-07-08 02:11:56



Editorial: Inclement Weather Slows Progress on Garden Railway

Puckdropper's Place has been promising us they would have permanent rail service soon. Soon has come and gone, and we still don't have permanent rail service. I spoke with my cousin's uncle's aunt's brother's father's relative, and he told me that the weather has been too bad. Work crews cannot get anything done, and I believe them. Just look at Weather Underground's Dopplar Radar Image.

I saw work crews out this week, so I'm hoping for the best. I look forward to the first run of the LGB Porter, my favorite locomotive. I already have tickets to the first running of the locomotive, when ever that may be. So, local residents, don't fret. I'm sure we'll see rail service soon.

Wai Ting
Ashley, IN

This post has been edited at 2006-07-08 02:11:59

This post has been edited at 2006-11-13 01:22:07



Press Release: Puckdropper's Place acquires rail, ROW.

Puckdropper's Place, Inc announced today the purchase of one box of 8 ft diameter Aristocraft track as well as 4 36 inch straight sections. This is one of the final steps in President Puckdropper's goal to have trains running outdoors by Christmas.

Puckdropper's Place also annouced an agreement with the Land Maintenance and Operations Manager (MOM), where if the railroad is unable to be maintained or operated, the right of way will revert to its original use.


View next 3 entries

Home Creative Stuff Model Railroad Ice Rink Computers message board Site Updates